The pool construction set for this September will include the addition of a swim-up bar. The shallow circle of the pool will be converted into the bar and will include a dry bar.
There is new furniture ordered for the pool area, should arrive within a month.
There is new furniture ordered for the Melange Bar, should arrive within a month.
The air conditioner in the disco and the buffet area has been replaced.
There is a plan to put a priority on the roofs that need repair.
The area in the Melange Bar that had the swinging beds is currently being updated with new tile, new polycarbonate roof, but I’m not sure if the swinging beds are going to be used again or some other seating arrangement.
The rooms are going through heavy maintenance; they were working on the 1400 building when we were there. Each week, 2 rooms are worked on to include painting, replacing broken tiles, etc. They are currently about 50% done with this process and all rooms will be completed.
The food and beverage offerings have been worked on and we felt the food was the best we have experienced.
So, in the few months the new GM has been at the resort, many behind the scenes items have been worked on and now physical changes will soon be occurring. After our discussion with him, we are looking forward to experiencing these changes in our next visit.